Reza Nur

← back

In-Product Refunds Experience for Worker Retention

Kanggo·

I can't show the graphs. That data stays with Kanggo. Happy to describe the numbers at a high level.

Overview

CompanyKanggo (Marketplace)
ThemeTurning refunds from an ops cost into a retention tool
StatusShipped, the dominant refunds channel within 2 weeks of full rollout
Initial constraintNo central team owned refunds. Workers saw the policy as unfair and inconsistent
Success metricWorker LTC and retention. Support cost per refund case
RoleProduct Manager: scoped the MVP, defined the launch bar with design and engineering, planned the staged rollout with Customer Support

Problem

On Kanggo, workers find projects through the marketplace. When a project goes bad (the customer cancels, the same lead reaches two workers, the brief changes, or the project breaks our terms), the only way to ask for a refund was to email support. Those refunds were slow, inconsistent, and stingy, and workers noticed. Pro NPS and likelihood to continue (LTC) were low, and chargebacks were high.

The pain showed up in three places.

Workers had no easy way to ask for a refund, and didn't get refunded for many bad projects, including ones where the customer never even viewed their response. The policy read as unfair. Workers didn't feel Kanggo had their back.

Support agents on the phone felt they had to grant refunds even when the policy said no. Their performance reviews were tied to it.

The company saw low LTC and high chargebacks, signs of a product problem, not just a policy problem. And no central team owned refund evaluation, so the policy was applied inconsistently.

The decision

OptionWhat it meansThe catch
A. Stay stingyRefund only clear breaches of our promise to the worker (say, ToS violations)Workers already saw the policy as unfair and inconsistent, and scrutinizing every case cost ops time
B. Make workers work for itRefund more cases, but require extensive proof and effortTells workers we don't trust them, and agents still go through every case by hand
C. Refunds as product experienceGrant refunds by default to close product gaps, educate workers along the way, and watch for abuseMore refunds go out. In exchange, less ops time, and a frustration point turned into a retention mechanism

We picked C. The MVP's job was to build the infrastructure that made it real.

What I Delivered

1. An in-product refund flow

2. A semi-automated review process

Kickoff in November, 5% rollout in January, and 100% by early March. End to end in about four months.

Challenges

1. Design speed vs. research

To hit the Q4 launch, engineering needed designs fast. The designer was new to this area and wanted to run research first. Fix: they were pulled off other projects to focus on refunds, and we tested MVP designs with a field officer instead of workers to get feedback faster.

2. A Trust & Safety requirement we'd missed in scoping

Trust & Safety reviews all free-text responses for safety concerns, a requirement we hadn't scoped. Fix: a working session with T&S and refunds ops to align on process and SLA (no new headcount needed), plus new email copy for cases with a T&S concern.

3. Defining launch readiness, and a rollout support could staff

No frontend tech lead meant no clear bar for what blocked launch. And Customer Support worried about refund volume after launch. They wanted a way to allocate staffing and hold the refunds SLA. Fix: I put together launch-blocking bug levels with design and engineering (P0 = blocks a critical user journey, P1 = medium bugs, P2 = complicated, non-blocking), and we rolled out in stages (5%, 25%, 50%, 100%), so CS could watch volume and adjust staffing.

Results

MetricOutcome
Feature adoption and usageDominant refunds channel within 2 weeks of full rollout. 5+ requests per week. 80% funnel completion.
Worker LTC53% vs 47% for email refunds, at comparable grant rates
RetentionNot examined at launch. When we later changed the policy significantly (price assurance), retention rose ~5%.
Support cost per refund caseNever fully measured. Estimated at ~IDR 50 million per year in savings. Small, because the company and the market were both early.
Revenue guardrailNot crossed

I left the team at the end of Q1, so the rollout numbers above are from the team's tracking.

What I would improve next